| Development | Section 73 application to vary conditions 2, 6, 9 and 23, alongside the removal of conditions 29 and 30 attached to planning permission 25/P/0809/FUL (Ground mounted photovoltaic solar farm together with Battery Energy Storage, associated equipment, infrastructure and ancillary works with new substation off Drove Way) to allow for additional solar arrays to be sited within the area labelled ‘Field 6’ alongside confirmation that the approved substation is not required to be decommissioned alongside the rest of the project after 40 years from first export |